Castle Minerals Announcements
Having trouble reading this email? Click here
|
June 2012 Quarterly Report
Dear MvM Commodity Group
-
Quarterly exploration activity included 32,011m drilling:
-
103 RC Holes for 3,676m
-
1,241 RAB holes for 21,378m
-
1,433 Auger holes for 6,957m
-
3,041 soil samples collected
-
Castle’s own RAB rig successfully drilled 21,378m at a total cost less than one third of contract rates
-
New high – grade gold vein intersected at Julie West 9Danyawi) with RC drilling reporting
-
12JWRC220 16m @ 14.7g/t gold from 32m
-
12JWRC237 8m @ 13.48g/t gold from 17m
-
12JWRC242 9m @ 3.01g/t gold from 27m
-
12JWRC243 17m @ 7.34g/t gold from 21m
-
12JWRC244 15m @ 7.95g/t gold from 29m
-
12JWRC245 15m @ 5.44g/t gold from 34m
-
RC drilling confirms a high grade graphite deposit at Kambale with graphitic carbon drill results reporting:
-
KBAC 09 30m @ 9.12%C from 24m
-
KBAC 13 46m @ 8.09%C from surface
-
KBAC 41 19m @ 10.74%C from 21m
-
KBAC 44 24m @ 8.46%C from 2m
-
KBAC 46 26m @ 10.85%C from 30m
-
KBAC 84 19m @ 9.56%C from 3m
-
KBRC 01 52m @ 7.60%C from 40m
Metallurgical test work and resource estimation are underway
-
Auger drilling defines strong anomaly at the new Pole prospect. The largest anomaly extends for over 5km and includes a peak auger sample reporting 7,170ppb gold.
-
RC drilling at Baayiri prospect reported best results of 10m @ 2.51g/t gold from 44m and 11m @ 1.46g/t gold from 79m.
|
|
June 2012 Quarterly Report |
|
|
|