🕐30.08.11 - 16:54 Uhr

SIGNIFICANT DRILL RESULTS CONTINUE TO BE INTERSECTED IN THE MURRAY BROOK DEPOSIT
, THE FIFTH LARGEST MASSIVE SULFIDE DEPOSIT IN THE BATHURST MINING CAMP



======================================================================= Re: News Releases - Tuesday, August 30, 2011 Significant drill results continue to be intersected in the Murray Brook deposit, the fifth largest massive sulfide deposit in the Bathurst Mining Camp ======================================================================= - Significant drill results; including: - 4.65 % zinc, 1.90% lead, 1 gpt gold and 69.86 gpt silver over 36 meters in MB-2011-10 - 3.87 % zinc, 0.78% lead, 0.66 gpt gold and 35.5 gpt silver over 64.5 meters in MB-2011-14 - 3.84 % zinc, 1.43% lead, 0.36 gpt gold and 59.37 gpt silver over 75.1 meters in MB-2011-09 - Drill results confirm higher silver, gold, zinc and lead content than historically reported. - Phase I, 15 drill holes completed for a total of 3,132.5 meters - $1 Million Phase II drilling program including 6650 meters drilling initiated - Massive-sulfide body approaches the surface to the south in the pit area and plunges to the north - Out of a total of 1,034 samples obtained from the massive sulfide body, 12% returned assays of greater than 10% lead and zinc combined and 24% returned values of greater than 1 g/t gold. - The deposit remains open and there is good potential to increase grade with additional drilling. August 30th, 2011, Vancouver, Canada.

-- El Ni�o Ventures Inc.

("ELN" and the "Company") (TSX.V: ELN; Frankfurt: E7Q) is pleased to announce significant diamond drill results of the 2011, 15 hole drill program on the Murray Brook Massive-Sulfide Deposit located in the Bathurst Mining camp, New Brunswick, Canada.

Votorantim Metals Canada Inc (VM Canada) is operator of the program. A total of 15 holes have been completed to date on the Murray Brook project.

Table 1 below illustrates significant drill results from Phase I, 3132.5 meters, drill program, included massive sulphide intersections.

Phase I drilling campaign focused on three objectives; 1.

Infill drilling; Drill holes are located between historical, collar locations; where there are up to 100 meters between reported intercepts in historical holes, compiled from work reports of earlier drill programs. 2.

Step-out drilling; to expand the size of the massive-sulfide body. 3.

Due Diligent drilling; Votorantim, as operator, conducted a 595.2 meters diamond drilling program to confirm results reported from previous drilling programs on the Murray Brook mining lease. The program incorporated recommendations by P&E Consulting to ensure the database is compliant with protocols required for a NI 43-101 resource calculation.

A total of 1,034 samples were analysed at TSL Laboratories Inc.

(TSL) in Saskatoon, Saskatchewan. Please click on the hyperlink to view the entire news release: http://www.elninoventures.com/s/NewsReleases.asp?ReportID=475917
On Behalf of the Board of Directors, "Harry Barr" Harry Barr, Chairman and Acting CEO
For further information, please contact Investor Relations at Toll Free 1.800.667.1870 or by email at To unsubscribe to our Email list, please click: MAILTO:?subject=UNSUBSCRIBE-ELN_News Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. Note: this release contains forward-looking statements that involve risks and uncertainties.

These statements may differ materially from actual future events or results and are based on current expectations or beliefs.

For this purpose, statements of historical fact may be deemed to be forward-looking statements.

In addition, forward-looking statements include statements in which the Company uses words such as "continue", "efforts", "expect", "believe", "anticipate", "confident", "intend", "strategy", "plan", "will", "estimate", "project", "goal", "target", "prospects", "optimistic" or similar expressions.

These statements by their nature involve risks and uncertainties, and actual results may differ materially depending on a variety of important factors, including, among others, the Companys ability and continuation of efforts to timely and completely make available adequate current public information, additional or different regulatory and legal requirements and restrictions that may be imposed, and other factors as may be discussed in the documents filed by the Company on SEDAR (www.sedar.com), including the most recent reports that identify important risk factors that could cause actual results to differ from those contained in the forward-looking statements.

The Company does not undertake any obligation to review or confirm analysts expectations or estimates or to release publicly any revisions to any forward-looking statements to reflect events or circumstances after the date hereof or to reflect the occurrence of unanticipated events.

Investors should not place undue reliance on forward-looking statements. This email should not be construed as an offer to buy or sell securities of El Ni�o Ventures Inc. ======================================================================= Copyright (c) 2011 EL NINO VENTURES INC.

(ELN) All rights reserved.

For more information visit our website at http://www.elninoventures.com/ or send mailto: Message sent on Tue Aug 30, 2011 at 6:00:33 AM Pacific Time =======================================================================



Products & Services | Jobs