🕐22.09.10 - 21:00 Uhr

LEVON REPORTS EXCELLENT PHASE 2 BULK TONNAGE AG, AU, ZN, PB DRILL RESULTS, OPEN
TO EXPANSION IN TWO DISCOVERY ZONES AT CORDERO PROJECT, CHIHUHUA, MEXICO





 

LEVON RESOURCES LTD

TSX Venture                                             LVN
US OTC                                                  LVNVF
Frankfurt                                                  LO9

52-week range                       $0.15 - $1.05
Shares Outstanding                   82,386,634

Investor Relations                604.682.3701

 

                                         

LEVON REPORTS EXCELLENT PHASE 2 BULK TONNAGE AG, AU, ZN, PB DRILL RESULTS, OPEN TO EXPANSION IN TWO DISCOVERY ZONES AT CORDERO PROJECT, CHIHUHUA, MEXICO

Levon Resources, Ltd is pleased to report the final Phase 2 drill assay results for 27 core holes in two zones at the Cordero silver, gold, zinc, lead bulk tonnage property, located 35 kilometres northeast of Hidalgo Del Parral, Chihuahua, Mexico.   These results continue to expand the Pozo de Plata Diatreme and Cordero Porphyry discovery zones, which remain open in plan and at depth.  Currently Phase 3 offset definition, delineation and exploration drilling is being laid out.

Highlights

Some of the significant drill intercepts include 118 metres grading 51 g/T Ag, 0.397 g/T Au, 0.41 % Zn, 0.96% P (117 g/T Ag equivalent) in hole C10-46 at the north edge of the Pozo de Plata drill grid and 100 metres grading 72.8 g/T Ag, 0.425 g/T, 0.97 % Zn, 1.11% Pb (162 g/T Ag equivalent) in hole C10-35 in a west part of the drill grid. 

Vertical hole C10-60 was collared south of previously announced drill hole C10-39 at the southern edge of the drill grid.

Starting from 4 metres depth,  C10-60 intersected 100 metres that grades 31.7 g/T Ag, 0.08 g/T Au 0.34% Zn and 0.38% Pb, and a deeper interval starting at 228 metres  of a 62 metre core interval grading 22.3 g/T Ag, .012 Au, 2.05 % Zn and 0.43% Pb, this intersection remains open to the south.

Table 1 lists calculated drill intercept composites for the 27 holes.  Reported lengths (Table 1) are drill intervals only as true widths are unknown.  Table 2 lists the hole locations.

Table 1.  Drill intercept composites for the final 27 holes in the Pozo de Plata and Porphyry  zones of the Phase 2 Cordero drilling program 

 

Hole

Zone

from (m)

to (m)

length (m)

Ag (g/T)

Au (g/T)

Zn %

Pb %

Ag Eq.(g/T)*

C10-21

 

Composites below cut off

 

 

 

 

 

C10-27

Porphyry

88

96

8

21.3

0.042

0.52

0.22

46

 

 

208

248

40

22.7

0.070

0.38

0.41

50

 

 

276

292

16

20.5

0.005

2.77

0.40

113

 

 

310

334

24

17.9

0.022

0.26

0.31

36

C10-29

Porphyry

70

82

12

60.6

0.490

0.61

0.35

121

 

 

116

148

32

149.7

0.030

1.48

1.72

245




Products & Services | Jobs